Pietenpol Projects

April & May 2017

Posted on May 23, 2017 at 4:40 PM

April / May sees us back at it slowly but surely.  Phil rips some capstrip material,builds the bending jig and laser cuts gromments.  Jim makes the blocks for the rib jigs, bends some capstrips and starts to assemble a jig. Jig assembled and first set of capstrips cut.  Goal for June: Make at least one rib and assemble second rib jig.